SCHOOL IN THE READING AREA

Before                                                                            After

      

Problem

Existing single glazed timber screens over 3 storeys. Timber badly rotting in parts, existing panels incorporating asbestos breaking down, screens generally in very poor condition internally. Steel opening ventilators generally in poor repair and not offering ideal means of ventilation.

Solution

Removal of existing timber curtain walling. Replacement curtain walling incorporating double weatherstripped opening lights. Double glazed with sealed units incorporating toughened and laminated glass with solar control bodytint. Spandrel panels in insulated Trespa. The facade was fully scaffolded to facilitate the operation which included the removal and re-positioning of extensive science laboratory desk/benches and the disconnection and re-commissioning of gas,water, central heating pipework and electrics. Included within the replacement work was the provision of new parapet flashings. Partition and floor closers along with general making good and architrave trims as required

Next page